Overview
Crushed stone is a manufactured angular aggregate produced by mechanically fracturing limestone, granite, or traprock through rock crushers and vibrating sieves. This Crushed Stone Calculator estimates exact cubic yardage and purchasing tonnage across standardized ASTM stone sizes (#57, #411, #8, and #3), providing customized coverage rates per stone grade.
Estimates are for material planning and budgeting purposes only. This calculator does not provide geotechnical engineering, structural design, or official building code compliance advice. Always verify measurements, aggregate densities, and compaction requirements with a local quarry supplier or licensed contractor before ordering materials or commencing construction.
Worked Examples
Example 1: 200 sq ft Patio Base with #57 Stone (3 in Deep with 10% Waste)
Inputs: Area = 200 sq ft, Depth = 3 in, Grade = #57 (2,700 lb/yd³), Waste = 10%, Price = $38.00/ton
- Convert depth: 3 in ÷ 12 = 0.25 ft.
- Net cubic feet: 200 sq ft × 0.25 ft = 50.00 cu ft.
- Convert to cubic yards: 50.00 ÷ 27 = 1.8519 cu yd.
- Add 10% waste buffer: 1.8519 × 1.10 = 2.0370 cu yd.
- Calculate total weight: 2.0370 cu yd × 2,700 lb/cu yd = 5,500.00 lb.
- Convert to US tons: 5,500.00 ÷ 2,000 = 2.75 US tons.
- Calculate coverage rate: (2,000 ÷ 2,700) × 27 ÷ 0.25 = 80.0 sq ft per ton.
- Calculate cost: 2.75 tons × $38.00 = $104.50.
Final Answer: 2.75 US tons to order (2.04 cu yd; 80.0 sq ft/ton coverage; $104.50 material cost)
Example 2: Shed Foundation with #411 Crusher Run (4 in Deep with 10% Waste)
Inputs: Area = 120 sq ft, Depth = 4 in, Grade = #411 (2,950 lb/yd³), Waste = 10%
- Convert depth: 4 in ÷ 12 = 0.3333 ft.
- Net cubic feet: 120 × 0.3333 = 40.00 cu ft ÷ 27 = 1.4815 cu yd.
- Gross volume (10% waste): 1.4815 × 1.10 = 1.6296 cu yd.
- Weight: 1.6296 cu yd × 2,950 lb/cu yd = 4,807.41 lb ÷ 2,000 = 2.40 US tons.
- Coverage per ton: (2,000 ÷ 2,950) × 27 ÷ 0.3333 = 54.9 sq ft per ton.
Final Answer: 2.40 US tons to order (1.63 cu yd; 54.9 sq ft/ton coverage)
Example 3: Heavy Sub-Base with #3 Ballast Stone (6 in Deep with 12% Waste)
Inputs: Area = 300 sq ft, Depth = 6 in, Grade = #3 (2,550 lb/yd³), Waste = 12%
- Convert depth: 6 in ÷ 12 = 0.50 ft.
- Volume: 300 × 0.50 = 150.00 cu ft ÷ 27 = 5.5556 cu yd.
- Gross volume (12% waste): 5.5556 × 1.12 = 6.2222 cu yd.
- Weight: 6.2222 × 2,550 ÷ 2,000 = 7.93 US tons.
Final Answer: 7.93 US tons to order (6.22 cu yd; 7.93 tons ordered)